KitLog pro

Powered By Kitlog Pro v2.0

Steve's CH750 Cruzer (N750SB)
' style=
Date:  12-31-2018
Number of Hours:  2.75
Manual Reference:  
Brief Description:  Baggage area prep

Performed final securing of lines and hoses in the lower baggage bay. Added missing L angle to the tunnel projection on passenger side and riveted it. Cleco'd baggage floors into place.
' style=

Ready to rivet

Ready to rivet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.