KitLog pro

Powered By Kitlog Pro v2.0

Steve's CH750 Cruzer (N750SB)
' style=
Date:  8-20-2018
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Stab riveting

Cleaned the dust from the H-stab and elevator. Added cotter pins to castle nuts on elevator controls. Added shrink tube to nicopress sleves. Riveted elevator to stab. Riveted the stab gussetts and pilot side rear panel, which I had left cleco'd for accessability until now. Did not bolt the stab yet. Also riveted the rudder cable fairlead covers. Boy, I hope I didn't forget anything.
' style=

Pilot side gussett and skin panel riveted

Pilot side gussett and skin panel riveted

' style=

Passenger side tail feathers

Passenger side tail feathers

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.