KitLog pro

Powered By Kitlog Pro v2.0

Steve's CH750 Cruzer (N750SB)
' style=
Date:  5-9-2018
Number of Hours:  7.25
Manual Reference:  
Brief Description:  Wired PTT switches, started panel wiring

Started out by wiring the PTT switches to the jack harness. Zip tied the PTT harness to the control tube. Added a zip clip to the tunnel cover and tunnel sides to provide securement locations to ensure the wiring does not contact the control cables.

Reassembled the test fit panel. Should have the final panel being cut by one of my fellow drafting students before too long. In the meantime, the original will do for getting the wires run to everything.

Also added a ground to the firewall.

Connected the harness wires from the pumps to their respective switches.

Began wiring the panel including the power panel. Ran main power and ground lines to the power panel. Started reconnecting everything needed to keep the engine running. Most all of that was just reconnecting the wires from the looms to their previous locations on the engine power and ground busses.

Began routing non-essential systems to the power panel. This includes the Viking View and tach wiring.
' style=

PTT wiring

PTT wiring

' style=

Ground to Frame

Ground to Frame

' style=

Starting to hook up power panel and instruments

Starting to hook up power panel and instruments

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.