Steve's CH750 Cruzer (N750SB)
' style=
Date:  7-20-2017
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Receiving Engine Part 1

It took 1 week between pick-up and delivery of my Viking 130 engine and FWF. I had already received the batteries separately a few days before. Delivery scheduled between 10AM and 2PM, but the driver called shortly after 3:45PM. As expected, there was no way the truck was getting down the narrow, hilly roads to my house, so I arranged to meet him at a gas station on the highway. The transfer was uneventful and aftyer securing the load in my pickup, I drove home to the shop. After removing the cover of the pallet, I immediately noticed some chipping, roughness on one corner of the lower cowling. Will take a better look later. With the pallet still on the truck, I proceeded to unload everything except the engine itself.

Note that Samantha at Viking indicated the prop, coolant tanks, and heater would be arriving separately so I expect them soon, along with the replacement for the recently recalled flywheel part.
' style=

No way this truck was getting to my house

No way this truck was getting to my house

' style=

Packing lid removed

Packing lid removed

' style=

Corner of lower cowling pretty rough

Corner of lower cowling pretty rough

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.