KitLog pro

Powered By Kitlog Pro v2.0

Steve's CH750 Cruzer (N750SB)
' style=
Date:  4-27-2017
Number of Hours:  3.75
Manual Reference:  
Brief Description:  Finished prep of torque tube bearing assy, Positio

Finished drilling and bolting the front torque tube bearing assembly. Pre-riveted the torque tube sides to the support brackets. Reassembled the passenger side baggage and seat area in preparation for installing the sliding seat assembly.
' style=

Front torque tube bearing assembly

Front torque tube bearing assembly

' style=

Torque channel side bracket partially riveted

Torque channel side bracket partially riveted

' style=

Ready to start SSO assembly

Ready to start SSO assembly

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.