KitLog pro

Powered By Kitlog Pro v2.0

Steve's CH750 Cruzer (N750SB)
' style=
Date:  4-17-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Got nose gear drilled

Finished up drilling the base holes in the nose gear strut and fork assembly. That hardened steel was a bear to get drilled. I would have preferred to use a press, but the configuration of the strut made it impossible.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.