|
|
Steve's CH750 Cruzer (N750SB)
|
Date: 4-15-2017
|
Number of Hours: 2.50
|
Manual Reference:
|
Brief Description: Lower nose gear support, nose fork
|
|
Positioned lower gear assembly and drilled out holes for AN3 bolts. Disassembled, deburred, treated, and reassembled. Torqued all 8 bolts to 25 in/lbs.
My assembly guide said the fork and doubler needed AN4 bolts, but my plans said AN3, and my doubler was pre-drilled for AN3, so that is what I went with. Drew a centerline on the fork. Clamped the parts together and drilled through the pre-drilled doubler into the fork. Disassembled, deburred, treated, and reassembled. Torqued bolts to 25 in/lbs.
|
|
Lower gear support
|
|
Fork and doubler assembly
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |