KitLog pro

Powered By Kitlog Pro v2.0

Steve's CH750 Cruzer (N750SB)
' style=
Date:  4-6-2017
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Reinstalled pedal assembly

Final installation of the pedal assembly. I had taken it out when joining the fuselage. Installed and torqued the bolts on the end and center bearings. Added some grease to the bearing surfaces. Attached the brake cylinders, but did not install the cotter pin on top since they will need to be adjusted later.
' style=

Pedal assembly installed

Pedal assembly installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.