KitLog pro

Powered By Kitlog Pro v2.0

Steve's CH750 Cruzer (N750SB)
' style=
Date:  3-16-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Reassembly and riveting continues

Riveted most of the floor components. Made sure to get the parts that get covered up first. The hand riveter was required for most of the riveting for the heel plate and controls plate. Ran out of A5 rivets, so continued on the sections that get A4. UPS says my rivets should be here on Monday. I think I have enough A4 rivets to keep me busy till then. Just have to make sure I don't get carried away and cover up where the A5 rivets go. Still have more deburring and corrosion protecting to do for the seat and controls parts too.
' style=

Lots of hand rivet squeezer use in this area.

Lots of hand rivet squeezer use in this area.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.