KitLog pro

Powered By Kitlog Pro v2.0

Steve's CH750 Cruzer (N750SB)
' style=
Date:  1-16-2017
Number of Hours:  6.25
Manual Reference:  
Brief Description:  Riveted rear fuselage, Baggage floor work

Lots and lots of riveting. Riveted side skins to top and bottom longerons in rivet zones. Riveted top skin to baggage area top and top gussets and top channel. That included the 9 A6 rivets on each side. Also riveted the baggage back to the side skins and longeron gussets. Getting the four sides riveted together feels like a milestone.

Cut/drilled and prepped L angles for baggage floor and riveted those together. Cleco'd the baggage floor to the baggage back and fuselage sides. Cut/drilled and cleco'd the two small L angles that go on the baggage floor where it becomes narrower.
' style=

Riveting fuselage

Riveting fuselage

' style=

Top view of rear fuselage

Top view of rear fuselage

' style=

Baggage floor positioned

Baggage floor positioned

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.