Brief Description: Baggage back, top skin stiffeners
Cleco'd the baggage back top to the baggage back skin. Then cleco'd those to the baggage back supports. Laid the top skin in place and cleco'd. That allowed the baggage top to be drilled. Drilled the two forward holes of the longeron to 3/16 each side. With top skin in place I marked the rear cut-line on the top longerons. Removed the top skin along with longerons and set aside. I'm deburring parts as I assemble them and additional holes as they are drilled. Not applying Cortec yet except on the skins until it is time to rivet. Finally, riveted the stiffeners to the top skin and set aside. With my two 2X5 tables turned sideways, I had room for the fuselage and to work on the top skin facing the opposite direction.