KitLog pro

Powered By Kitlog Pro v2.0

Steve's CH750 Cruzer (N750SB)
' style=
Date:  6-27-2016
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Sort and stow parts

Spent time sorting through and finding homes for all the parts. Had a neighbor and my wife help me get the large skins on top of the build area where they will be out of the way until needed. Opened the big "aluminum parts" box and sorted into multiple boxes by sub-assembly, which Zenith's parts numbering system made convenient. Tested the pneumatic tools and verified they work. As I was sorting I tried to set aside the tail pieces in the work area so they would be handy once I begin construction (hopefully in a day or 2). The heat and humidity have been mighty unpleasant lately. I may need to get a small air conditioner and cut a hole in the shop wall. So far it looks like everything made the trip home safely. I'm currently re-installing XP on an old laptop to keep in the shop for perusing the assembly guide pdf's and the homebuilt-help DVD. Probably won't even hook up a wireless adapter.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.