KitLog pro

Powered By Kitlog Pro v2.0

Sean's RV 7 Project
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-18-2013
Number of Hours:  1.15
Manual Reference:  
Brief Description:  Tunnel Attach Points

I decided to utilize some nylon attach points with blind rivets in the center tunnel. I can either zip tie wires to these, or zip tie conduit and run the wire that way. This should work well.
' style=

Wiring will run through this tunnel and be secured to these bases.

Wiring will run through this tunnel and be secured to these bases.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.