Began the installation of the flap actuator assembly. Had to make a spacer and install some nutplates in the main channel. Fabricated bracket that receives the upper bolt. Performed the safety modification to the lead screw and drilled the prescribed hole with wire to capture the assembly so it can't come upper under torque. I broke two bits getting this hole drilled, but it turned out fine.