Powered By Kitlog Pro v2.0
Steve Zelenys RV-7
RV-7
Horizontal Stab.
4-11-2010
< Previous Log Entry
Next Log Entry >
Date:
4-11-2010
Number of Hours:
3.50
Manual Reference:
Brief Description:
Horizontal Stab. Rear Spar
This evening I matched drilled all the holes in the rear spar, de-burred the holes, smoothed all the rough surfaces and did some light priming. Later I clecoed the whole assembly together and started riveting.
Priming
Riveting
The final product
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
27
81
Emp. R/H Elevator
2
9
Emp. Rudder
4
14
Horizontal Stab.
9
23
Preparation
4
13
Rudder
4
14
Vertical Stabilizer
4
8
Copyright © 2001-2024 Matronics. All Rights Reserved.