Powered By Kitlog Pro v2.0
Steve Zelenys RV-7
RV-7
All
4-23-2010
< Previous Log Entry
Next Log Entry >
Date:
4-23-2010
Number of Hours:
1.50
Manual Reference:
Brief Description:
De-burring
When I was happy with the fit between the ribs the spars and the skin I dissasembled all of the pieces and began finishing the edges and de-burring the holes. I will still need to finish the edges on a few more of the ribs.
Horizontal stab. ribs and forward spar.
De-burring
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
27
81
Emp. R/H Elevator
2
9
Emp. Rudder
4
14
Horizontal Stab.
9
23
Preparation
4
13
Rudder
4
14
Vertical Stabilizer
4
8
Copyright © 2001-2024 Matronics. All Rights Reserved.