KitLog pro

Powered By Kitlog Pro v2.0

K rv
< Previous Log Entry          Next Log Entry >
' style=
Date:  6-24-2007
Number of Hours:  0.00
Manual Reference:  
Brief Description:  

Whoever packed these boxes is a master at it - everything was so well protected and space was maximized inside these relatively small boxes - it's hard to believe that a horizontal stabilizer, vertical stabilizer, elevator, and rudder are all in there! I was able to inventory my hardware bag, which took about 30 minutes.

Oh yeah, one other thing. I decided to unpack and look at my full size plans - each page has a huge smudge on it that appears to have come from the printer or copier. Tomorrow I'm calling Van's to see if I can get another set sent out.

Tags: empennage, shop preparation

The first thing I did today (and the thing that took the most time) was build ANOTHER table - this one is much smaller and I was able to build it out of the scrap from my work tables. It's the same design, different dimensions (36" x 18" top) and is primarily for my belt sander and bench grinder.



After that I finished filing and dressing the edges of the two HS609-PP and then I cleco'd them and the two HS603-PP all together (every 3rd hole).
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.