Powered By Kitlog Pro v2.0
BOB'S WEB SITE
RV-10
All
11-26-2017
< Previous Log Entry
Next Log Entry >
Date:
11-26-2017
Number of Hours:
2.00
Manual Reference:
Brief Description:
Elevator push rod
Cuff sanded and primed the exterior of the elevator push rod. Installed the push rod end fittings and threaded rod bearings.
Fabricated the angle jig for setting the elevator bell crank travel.
Installed the Elevator push rod. It fit perfectly the first time.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
132
368
Elevator
26
67
Empennage
16
40
Horizontal Stab
13
44
Miscellaneous
2
4
Rudder
13
48
Tail Cone
45
115
Tools
2
8
Vertical Stab
15
42
Copyright © 2001-2024 Matronics. All Rights Reserved.