Drilled right longeron to #40. Drilled all the skin-to-bulkhead holes to size on the vertical sides. Flipped the tailcone and drilled the bell-crank stiffners and bulk heads to size.
Flipped tailcone upright, and began cleco'ing rear turtle-deck into place. Even with ~400 cleco's, I still don't have enough. Just bought 100 more...