KitLog pro

Powered By Kitlog Pro v2.0

GLENN C'S WEB SITE
' style=
Date:  1-4-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Flap Tapes and Patches

Finished gluing tapes, drain grommets and patches to both flaps and ironed down edges. Both are now ready for paint.
' style=





' style=

The bubbles on each side of the ribs were easily ironed down

The bubbles on each side of the ribs were easily ironed down

' style=

Both flas are ready for paint

Both flas are ready for paint

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.