Powered By Kitlog Pro v2.0
GLENN C'S WEB SITE
S-20 Raven
Fuselage
1-16-2017
< Previous Log Entry
Next Log Entry >
Date:
1-16-2017
Number of Hours:
3.50
Manual Reference:
Brief Description:
Left Door Construction
Sanded primered fabric on left door. Becan assembling door frame and window.Forward door trim angle did not match up with door frame tubing and too much gap compared to fuselage tube so another forward trim piece will have to be made.
Forward trim does not match fuselage
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Raven Home
Category
# Logs
# Hours
All
322
824
Avionics
17
44
Covering
60
200
Empennage
8
20
Engine
19
41
Fuselage
94
228
Miscellaneous
5
12
Painting
37
118
Prop
3
6
Wings
79
155
Copyright © 2001-2024 Matronics. All Rights Reserved.