Powered By Kitlog Pro v2.0
GLENN C'S WEB SITE
S-20 Raven
All
1-4-2016
< Previous Log Entry
Next Log Entry >
Date:
1-4-2016
Number of Hours:
5.00
Manual Reference:
Brief Description:
Flap Tapes and Patches
Finished gluing tapes, drain grommets and patches to both flaps and ironed down edges. Both are now ready for paint.
The bubbles on each side of the ribs were easily ironed down
Both flas are ready for paint
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Raven Home
Category
# Logs
# Hours
All
322
824
Avionics
17
44
Covering
60
200
Empennage
8
20
Engine
19
41
Fuselage
94
228
Miscellaneous
5
12
Painting
37
118
Prop
3
6
Wings
79
155
Copyright © 2001-2024 Matronics. All Rights Reserved.