Powered By Kitlog Pro v2.0
GLENN C'S WEB SITE
S-20 Raven
All
12-15-2015
< Previous Log Entry
Next Log Entry >
Date:
12-15-2015
Number of Hours:
4.00
Manual Reference:
Brief Description:
Patches, Tapes and Drain Grommets
Cut out patches for right flap, applied glue and glued them down. Glued drain grommet to right aileron per figures manual.
Patch has not been applied in this pic yet
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Raven Home
Category
# Logs
# Hours
All
322
824
Avionics
17
44
Covering
60
200
Empennage
8
20
Engine
19
41
Fuselage
94
228
Miscellaneous
5
12
Painting
37
118
Prop
3
6
Wings
79
155
Copyright © 2001-2024 Matronics. All Rights Reserved.