KitLog pro

Powered By Kitlog Pro v2.0

RV
' style=
Date:  11-26-2008
Number of Hours:  1.20
Manual Reference:  8-2
Brief Description:  F-704 Bulkhead

I followed through the Vans standard build instructions to verify what had already been done to the F-704 buildhead quickbuild. I removed the bulkhead covers to check that and I had to add snap bushings for all the wiring holes and started assembling the control columns for a pre-fit.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.