Powered By Kitlog Pro v2.0
RV
RV-7
All
5-16-2008
< Previous Log Entry
Next Log Entry >
Date:
5-16-2008
Number of Hours:
2.40
Manual Reference:
6-5
Brief Description:
Vertical Stab Continued
I match-drilled the skin of the vertical stabilizer to the VS skeleton. I then disassembled everything and deburred all drilled holes in the skin, ribs, spars, etc.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7 Home
Category
# Logs
# Hours
All
117
303
Empennage
66
165
Fuselage
51
138
Copyright © 2001-2024 Matronics. All Rights Reserved.