KitLog pro

Powered By Kitlog Pro v2.0

RVGator
' style=
Date:  12-5-2012
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Foil inside cowl

The brief, flight and debrief too most of the day 11 AM to 4 PM but I did do some work when I returned home. I am done sealing the cowl so I put on the foil heat barrier on the lower cowl. I had planned to prime the inside and maybe paint but Jim’s plane has 750 hours on it and I noted he just left the cowl with the epoxy sealer, so that is good enough for me. I also mixed up some epoxy primer and put it on with a roller on the inside of the tail fairing, I was doing this as a test, I was thinking of using this on the outside of the cowl but I think I will stick with what the painter wanted which is a different primer (PPG K36) which is easy to sand off.. The epoxy primer would be a good sealer but I already have a good hard shell of clear epoxy on there.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.