KitLog pro

Powered By Kitlog Pro v2.0

Dons Web Site
' style=
Date:  8-29-2005
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Left wing construction

Worked on setting the wing in the jig tonight and made sure that it was straight and level. Checked for twist with a plumb bob. Lowered the plumb bob to the floor and made a mesurement from the string to the edge of the rear spar. Also drilled the wing walk support plate and started to attach the top skins.
' style=

Drilling the holes in the wing walk doubler that is under the inboard top skin.

Drilling the holes in the wing walk doubler that is under the inboard top skin.

' style=

The top skins are clecoed to the wing .

The top skins are clecoed to the wing .

' style=

top side of left wing with skins clecoed

top side of left wing with skins clecoed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.