Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
Panel
5-20-2011
< Previous Log Entry
Next Log Entry >
Date:
5-20-2011
Number of Hours:
12.00
Manual Reference:
Brief Description:
Panel
Cut-out the panel for the MGL Odyssey, MGL V10 Radio and Becker transponder.
There will also be three switches on the bottom left labeled Fuel Pump, Flaps and EFIS backup battery.
Painted the panel and installed the avionics.
Marking the panel
Panel cut out in progress
Painted and ready to install
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
2
288
Canopy
6
108
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.