KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
< Previous Log Entry          Next Log Entry >
' style=
Date:  9-24-2010
Number of Hours:  96.00
Manual Reference:  
Brief Description:  Finishing firewall forward

Installed the:

oil cooler and hoses
Fuel hoses
Throttle, mixture and pitch cables
Electrical cables
Fuel and oil pressure transducers
RADAC (For the EFIS) and engine sensors
Exhaust system and heat muff
Blast tubes
Baffle seals
' style=

Fitting the throttle cable

Fitting the throttle cable

' style=

Magneto blast tubes and oil hoses

Magneto blast tubes and oil hoses

' style=

Baffle seals

Baffle seals

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.