Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
Fuselage
8-8-2009
< Previous Log Entry
Next Log Entry >
Date:
8-8-2009
Number of Hours:
6.00
Manual Reference:
8-70
Brief Description:
Match drilled baggage door
Deburred the edges of all the baggage door components and Cleco'd them together.
Match drilled the holes in the baggage door assembly.
Cut the hinge to length and match drilled it as per instructions.
Uncleco'd all the baggage door components and deburred, dimpled / machine countersunk the holes.
Match drilling inner skin
Match drilling outer skin
Match drilled the hinge
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
2
288
Canopy
6
108
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.