KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
' style=
Date:  5-30-2009
Number of Hours:  6.00
Manual Reference:  8-58
Brief Description:  Installed elevator pushrods and bellcrrank

Riveted the holes in the F-840 pushrod I had previously left open to allow the primer to dry.

Riveted the elevator bellcrank assembly.

Installed the rod end bearings and jamb nuts on the pushrods and adjusted their length as per DWG 79.

Installed the pushrods and bellcrank in the fuselage. I used some dental floss to hold the spacer washers in position while inserting the bolt - works like a charm.

With the elevators clamped in their neutral position I adjusted the forward rod end on the F-841 pushrod to get the control sticks perpendicular to the upper longerons. (Used the digital level to check the angle of the sticks relative to the upper longerons)

Unclamped the elevators and couldn't believe how smooth and balanced the controls are - time to make some airplane noises!
' style=

F-840 pushrod riveted

F-840 pushrod riveted

' style=

Elevator bellcrank

Elevator bellcrank

' style=

Pushrods and bellcrank installed

Pushrods and bellcrank installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.