KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
' style=
Date:  1-19-2009
Number of Hours:  3.00
Manual Reference:  8-63
Brief Description:  Fuel vent lines

Made the left and right fuel vent lines.

We made the U-bend in the vent lines just wide enough so they can be removed through the upper hole in the gear towers to improve side skin bucking access.

Making the cockpit fuel and brake lines was tricky even with good access, so we're really glad we did them before installing the side skins.
' style=

LH vent line installed

LH vent line installed

' style=

Vent line routing

Vent line routing

' style=

Fuel and brake lines

Fuel and brake lines

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.