KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
' style=
Date:  12-8-2008
Number of Hours:  8.00
Manual Reference:  8-27
Brief Description:  Drilled cockpit rails and landing gear box webs

Clamped the cockpit rails to the fuselage and match drilled the upper longerons. We used two clamps at the center section bulkheads to pull the edge of the cockpit rails flush with the outer surface of the side skins.

Aligned the outboard edge of each landing gear box web flush with the vertex of its associated longeron by using a cargo strap and drilled the holes.
' style=

Clamping the cockpit rails

Clamping the cockpit rails

' style=

Both cockpit rails drilled

Both cockpit rails drilled

' style=

Cargo strap used to pull gear tower webs flush to longeron vertex

Cargo strap used to pull gear tower webs flush to longeron vertex

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.