Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
Fuselage
10-18-2008
< Previous Log Entry
Next Log Entry >
Date:
10-18-2008
Number of Hours:
7.00
Manual Reference:
8-16
Brief Description:
Match drilled the lower longerons
Match drilled the LH and RH lower longerons to the Fwd Fuselage Substructure.
Machine countersunk the bottom of the forward floor for the screws attaching the L.G box weldments. (2 per side)
Removed the lower longerons and deburred all the holes.
Added a radius to the aft end of the vertex on each longeron as per Detail C, DWG 67.
Clecoed and temporarily bolted the lower longerons to the Fwd Fuselage Substructure.
Inserted the auxiliary longerons and clecoed the landing gear box and spacer plates in position.
Match drilled and deburred the holes between the mid cabin braces and center section assembly.
Drilling the LH lower longeron
And the RH lower longeron
RH auxiliary longeron in position
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
2
288
Canopy
6
108
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.