Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
Wings
11-24-2007
< Previous Log Entry
Next Log Entry >
Date:
11-24-2007
Number of Hours:
7.00
Manual Reference:
7-7
Brief Description:
Riveted left tank stiffeners
Dimpled the holes for the #8 screws in both tank skins with the c-frame tool and a hammer.
Cleaned the stiffeners, rivets and skin with MEK and strategically placed electrical tape on areas to be kept clean from tank sealant.
Mixed the first batch of proseal and riveted the stiffeners to the skin. Once this was done we dabbed a bit of sealant over every rivet head.
First four stiffeners sealed and riveted
Electrical tape works like a charm
LH side done
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
6
108
Canopy
2
288
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.