KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
' style=
Date:  10-27-2007
Number of Hours:  4.00
Manual Reference:  7-5
Brief Description:  Fitted the RH tank Z-brackets

Bolted the Z-brackets square to the spar and back drilled the top and bottom holes from below.

The platenuts were then attached to all but the inboard bracket and bolted to the spar, ready for the tank assembly to be installed.
' style=

RH Z-brackets installed

RH Z-brackets installed

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.