KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
' style=
Date:  10-27-2007
Number of Hours:  4.00
Manual Reference:  7-5
Brief Description:  Match drilled the RH wing leading edge

Match drilled the RH leading edge skin to ribs and ribs to spar.

Then filed the prepunched hole in the skin to center it over the tapped hole in the tiedown and drilled the hole to final size with a unibit.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.