Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
All
7-19-2009
< Previous Log Entry
Next Log Entry >
Date:
7-19-2009
Number of Hours:
6.00
Manual Reference:
8-67
Brief Description:
Riveted the aft fuselage bulkheads
Riveted the harness fairleads and canopy rail receptacle to the F-807B-1 bulkhead.
Riveted the nutplates to the F-808B-1 bulkhead.
Riveted the F-807/8/9/10B-1 bulkheads and F-869-L/R-1 gussets to the fuselage.
F-869-R-1 gusset
Aft upper bulkheads riveted
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
6
108
Canopy
2
288
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.