KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
' style=
Date:  6-16-2009
Number of Hours:  6.00
Manual Reference:  8-65
Brief Description:  Match drilled aft upper fuselage

Deburred, assembled and match drilled the bulkheads and aft upper fuselage skin.

Fabricated two aluminim nutplates to stow the tie down rings.

We decided to remove the empennage to gain access for drilling the aft top skin to the F-810A-1 bulkhead.
' style=

Match drilling bulkheads

Match drilling bulkheads

' style=

Homemade nutplates for tie down ring stowage

Homemade nutplates for tie down ring stowage

' style=

Match drilling aft top skin

Match drilling aft top skin

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.