Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
All
6-16-2009
< Previous Log Entry
Next Log Entry >
Date:
6-16-2009
Number of Hours:
6.00
Manual Reference:
8-65
Brief Description:
Match drilled aft upper fuselage
Deburred, assembled and match drilled the bulkheads and aft upper fuselage skin.
Fabricated two aluminim nutplates to stow the tie down rings.
We decided to remove the empennage to gain access for drilling the aft top skin to the F-810A-1 bulkhead.
Match drilling bulkheads
Homemade nutplates for tie down ring stowage
Match drilling aft top skin
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
6
108
Canopy
2
288
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.