Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
All
5-1-2009
< Previous Log Entry
Next Log Entry >
Date:
5-1-2009
Number of Hours:
6.00
Manual Reference:
8-40
Brief Description:
Riveted cooling ramp assembly
Cleco'd the cooling air ramp to the fuselage and final drilled the aft holes for blind rivets.
Removed it and deburred the holes.
Applied fuel tank sealant to the forward L.G cross member and forward floor panel where they contact the ramp and Cleco'd it in place.
Riveted the ramp to the fuselage as per instructions.
Applied a bead of fuel tank sealant along the full length of the cooling air ramp on both sides where it contacts the forward bottom skins.
Turned the fuselage upright.
Cooling air ramp riveted
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
2
288
Canopy
6
108
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.