KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
' style=
Date:  3-28-2009
Number of Hours:  6.00
Manual Reference:  8-47
Brief Description:  Seat floors #1

Deburred the edges of the seat and aft baggage floor components.

Cleco'd the floors to the fuselage and match drilled them as per instructions.

We read that other builders sometimes encounter problems with binding of the control column and need to slot the holes in the aft control mount or insert spacers in the forward mount to resolve the problem. We thus decided to temporarily install the control column before match drilling the aft mount to the seat floors - worked great and there is absolutely no binding.
' style=

Drilling seat floors

Drilling seat floors

' style=

Drilling aft control mount with control column in place

Drilling aft control mount with control column in place

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.