KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
' style=
Date:  2-22-2009
Number of Hours:  2.00
Manual Reference:  8-37
Brief Description:  Riveted aft deck and bellcrank rib

Turned the canoe right side up and finished riveting the side and bottom skins behind the F-810-1 bulkhead.

Riveted the aft deck in position. The elevator control stops are left un-riveted at this time to allow easy removal for trimming.

Riveted the bellcrank rib to the baggage rib using flush rivets. We couldn't find any AN470-AD3 rivets in our hardware so we decided to use flush rivets instead. Fortunately we checked this before priming so the baggage rib components were already dimpled and machine countersunk.
' style=

Turned the canoe

Turned the canoe

' style=

Aft deck riveted

Aft deck riveted

' style=

Bellcrank rib riveted

Bellcrank rib riveted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.