Brief Description: Riveted aft deck and bellcrank rib
Turned the canoe right side up and finished riveting the side and bottom skins behind the F-810-1 bulkhead.
Riveted the aft deck in position. The elevator control stops are left un-riveted at this time to allow easy removal for trimming.
Riveted the bellcrank rib to the baggage rib using flush rivets. We couldn't find any AN470-AD3 rivets in our hardware so we decided to use flush rivets instead. Fortunately we checked this before priming so the baggage rib components were already dimpled and machine countersunk.