Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
All
11-30-2008
< Previous Log Entry
Next Log Entry >
Date:
11-30-2008
Number of Hours:
4.00
Manual Reference:
8-27
Brief Description:
Match drilled the aft deck
Cleco'd the tailcone bulkhead tops and aft top skin to the fuselage.
Match drilled the aft deck as per instructions.
Bulkhead tops Cleco'd in position
Aft top skin Cleco'd on and aft deck drilled
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
2
288
Canopy
6
108
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.