Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
All
10-25-2008
< Previous Log Entry
Next Log Entry >
Date:
10-25-2008
Number of Hours:
8.00
Manual Reference:
8-19
Brief Description:
Mid /Fwd fuselage skins and structure
Match drilled the inboard seat ribs to the seat ramp supports.
Cut the hole in the RH outboard seat rib and mid side skin for routing the rear seat air vent hose.
Clecoed the mid side skins and structure together and drilled all the #30 holes as per instructions.
Joined the Fwd and Mid fuselage subassemblies and Clecoed the forward side skins, stiffeners and angles in position after deburring the edges.
Match drilled seat ribs to seat ramp supports
Mid side skins and structure Clecoed
Joining the FWD & MID Subassemblies
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
2
288
Canopy
6
108
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.