Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
All
9-20-2008
< Previous Log Entry
Next Log Entry >
Date:
9-20-2008
Number of Hours:
4.00
Manual Reference:
8-5
Brief Description:
Completed riveting gear towers
We finally received our long AN470 rivet set so we shot the lower rivets on the box weldments that couldn't be reached with the squeezer.
Once the towers were riveted we clecoed them to the forward floor and match drilled all the holes as per instructions.
Aft rivets on RH box weldment
Forward rivets complete
Ready to match drill to floor
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
6
108
Canopy
2
288
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.