Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
All
7-27-2008
< Previous Log Entry
Next Log Entry >
Date:
7-27-2008
Number of Hours:
6.00
Manual Reference:
8-2
Brief Description:
Match drilled Forward fuselage floor
Deburred all the components and match drilled the assembly.
Deburred all the holes and machine countersunk and dimpled as per instructions.
Trimmed the flanges of the cooling air ramp and match drilled the attach angle and stiffener.
Forward fuselage floor
Ready for priming
Cooling air ramp
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
2
288
Canopy
6
108
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.