KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
' style=
Date:  1-5-2008
Number of Hours:  3.00
Manual Reference:  7-7
Brief Description:  Installed vent lines in both tanks

Modified the snap bushings to accomodate the capacitive fuel sender wire and installed
them.

Flared, bent and installed the vent lines in both tanks.
' style=

LH tank vent line

LH tank vent line

' style=

RH tank vent line

RH tank vent line

' style=

Vent line bent up to tank high-point

Vent line bent up to tank high-point

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.