Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
All
1-5-2008
< Previous Log Entry
Next Log Entry >
Date:
1-5-2008
Number of Hours:
3.00
Manual Reference:
7-7
Brief Description:
Installed vent lines in both tanks
Modified the snap bushings to accomodate the capacitive fuel sender wire and installed
them.
Flared, bent and installed the vent lines in both tanks.
LH tank vent line
RH tank vent line
Vent line bent up to tank high-point
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
2
288
Canopy
6
108
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.