KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
' style=
Date:  12-30-2007
Number of Hours:  6.00
Manual Reference:  7-7
Brief Description:  Riveted LH tank interior ribs

Wet installed the rivets on all interior ribs and cleaned the outside surfaces of the tank with MEK.
' style=

Two ribs riveted at the bottom

Two ribs riveted at the bottom

' style=

Bottom done

Bottom done

' style=

Top done and on the wing for a test fit

Top done and on the wing for a test fit

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.