Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
All
6-8-2012
< Previous Log Entry
Next Log Entry >
Date:
6-8-2012
Number of Hours:
132.00
Manual Reference:
Brief Description:
Fitted the wheel pants and fairings
Aligned, trimmed, filled and sanded the wheel pants and fairings.
The wheel pants had to be modified to ensure adequate clearance to the brake calipers.
Cut out for caliper interference
Epoxy blister to clear caliper
Aligning and fitting the pants
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
2
288
Canopy
6
108
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.