KitLog pro

Powered By Kitlog Pro v2.0

Welcome to our RV-8 build log
' style=
Date:  7-16-2010
Number of Hours:  96.00
Manual Reference:  
Brief Description:  Installed the FAB

Before we could install the FAB it had to be modified to clear the alternator bracket.

We also made a drilling jig that simulates the fuel servo so that the FAB can be drilled from the aft side.
' style=

FAB drilling jig

FAB drilling jig

' style=

Modifying the FAB to clear alternator bracket

Modifying the FAB to clear alternator bracket

' style=

Installing alternate air door

Installing alternate air door

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.