Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
All
7-16-2010
< Previous Log Entry
Next Log Entry >
Date:
7-16-2010
Number of Hours:
96.00
Manual Reference:
Brief Description:
Installed the FAB
Before we could install the FAB it had to be modified to clear the alternator bracket.
We also made a drilling jig that simulates the fuel servo so that the FAB can be drilled from the aft side.
FAB drilling jig
Modifying the FAB to clear alternator bracket
Installing alternate air door
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
2
288
Canopy
6
108
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.